"SuperSucker270" 
Start of frame work.
Start of frame work.
Viewed: 76 times.

More of the frame. This was all
More of the frame. This was all "scrap" laying around that we used to build the frame.
Viewed: 62 times.

This is the tank we will be using. It's recycled and we got it localy used, but cleaned.
This is the tank we will be using. It's recycled and we got it localy used, but cleaned.
Viewed: 76 times.

Frame complete, and adding the pump and engine.
Frame complete, and adding the pump and engine.
Viewed: 75 times.

Configuring the engine placement.
Configuring the engine placement.
Viewed: 79 times.

Securing all the engine.
Securing all the engine.
Viewed: 73 times.

This was the original mounting. It turned the pump the wrong way and had to re-think the whole thing.
This was the original mounting. It turned the pump the wrong way and had to re-think the whole thing.
Viewed: 85 times.

Here is the pump and some of the plumbing. We are using a 2:1 reducing belt drive. The maximum pump speed is 1750 RPM. The engine turned 3500. So the 2:1 was perfect.
Here is the pump and some of the plumbing. We are using a 2:1 reducing belt drive. The maximum pump speed is 1750 RPM. The engine turned 3500. So the 2:1 was perfect.
Viewed: 107 times.

Another view of the plumbing.
Another view of the plumbing.
Viewed: 93 times.

Powered by Gallery v1 RSS