Start of frame work.
Viewed: 321 times.
|
More of the frame. This was all "scrap" laying around that we used to build the frame.
Viewed: 263 times.
|
This is the tank we will be using. It's recycled and we got it localy used, but cleaned.
Viewed: 288 times.
|
Frame complete, and adding the pump and engine.
Viewed: 282 times.
|
Configuring the engine placement.
Viewed: 283 times.
|
Securing all the engine.
Viewed: 282 times.
|
This was the original mounting. It turned the pump the wrong way and had to re-think the whole thing.
Viewed: 285 times.
|
Here is the pump and some of the plumbing. We are using a 2:1 reducing belt drive. The maximum pump speed is 1750 RPM. The engine turned 3500. So the 2:1 was perfect.
Viewed: 321 times.
|
Another view of the plumbing.
Viewed: 310 times.
|