"SuperSucker270" 
Start of frame work.
Start of frame work. *
Viewed: 321 times.

More of the frame. This was all
More of the frame. This was all "scrap" laying around that we used to build the frame. *
Viewed: 263 times.

This is the tank we will be using. It's recycled and we got it localy used, but cleaned.
This is the tank we will be using. It's recycled and we got it localy used, but cleaned.
Viewed: 288 times.

Frame complete, and adding the pump and engine.
Frame complete, and adding the pump and engine.
Viewed: 282 times.

Configuring the engine placement.
Configuring the engine placement. *
Viewed: 283 times.

Securing all the engine.
Securing all the engine. *
Viewed: 282 times.

This was the original mounting. It turned the pump the wrong way and had to re-think the whole thing.
This was the original mounting. It turned the pump the wrong way and had to re-think the whole thing. *
Viewed: 285 times.

Here is the pump and some of the plumbing. We are using a 2:1 reducing belt drive. The maximum pump speed is 1750 RPM. The engine turned 3500. So the 2:1 was perfect.
Here is the pump and some of the plumbing. We are using a 2:1 reducing belt drive. The maximum pump speed is 1750 RPM. The engine turned 3500. So the 2:1 was perfect. *
Viewed: 321 times.

Another view of the plumbing.
Another view of the plumbing. *
Viewed: 310 times.

* Comments available for this item.
Powered by Gallery v1 RSS